^Back To Top

foto1 foto2 foto3 foto4 foto5


Panel Orders

** Enternal Purchase

..................................

** Externel Purchase

..................................

** CNOOC Orders

...................................

** PETROCHINA Orders

..................................

** Tenders

..................................

** The results of the bid opening

....................................

## Terms domestic orders 

....................................

   Terms of overseas orders 

...................................

FOD Site

Stats site visitors

User Rating:  / 4
PoorBest 

 

MOC has announced the completion of the erection and operation of a new pumping in the Halfaya field the production capacity is large carried out by PetroChina the min operator of the field, for the purpose of processing oil sites , with industrial  water in the treatment washing of crude oil .

The DG of MOC Adnan N Sajet has pointed out that the station pays tribute  to the continuation of development in the ceremony for the purpose of developments production and export and need to provide large quantities  of industrial  water used in processing operation.

Adding that the new water plat is working at a high productivity  of 23000 C M P\D.

The official spokesman of the company Khaled  wahm  added that the operation of the plant for the processing of productive completion  in the field are ( CPF 1,CPF 2, and CPF 3) for the purpose of processing the product and making washing operation.

The field of Halfaya is located southeast of missan province, continuous development since 2010 by PetroChine and under the cadres MOC in order to reach the production of the field to 400 000 p/d.

Browse your email

time now

Important Sites

 

 

وزارة النفط

شركة نفط الجنوب

شركة نفط الشمال

رئاسة الوزراء

 

Oil prices WTI

Oil prices Brent

Natural Gas